RESOURCES
Contact:
Upstream Technologies Inc.
Suite 303
5201 East River Road
Fridley, MN 55421
651.237.5123
|
|
First Time User Instructions
- Please familiarize yourself with this instrument in your office before going into the field and running live tests.
- Please consult all the user manuals in the left hand menu.
- Use the Guide in the MPD App or click the MPD App Guide link on the left to help you get started.
- The MPD Training Video (Link on your left) is only 4 minutes long. Watch it several times.
- The most critical thing to remember when running an MPD test, is to fill the cylinder all the way up with water
and allow the cylinder to completely drain before finalizing a test. 30 centimeters of water drop is required by ASTM Standard D8152.
- If an account has not been created for you yet, Contact Us and we will create one.
- Once you have a username and password, enter this information in the OPTIONS tab in the MPD App on the tablet.
Then you will be ready to upload tests to our server and generate infiltration reports.
- Once you have uploaded tests from the MPD App, come back to this site and LOGIN to generate and download reports.
|
|